1.22.2010

Drilling Rigs Waiting on Us

Here are the drilling rigs at the Eden Garden Orphanage awaiting our drilling team's arrival. HANDS TOGETHER (the organization we were partnering with to drill the 2 water wells) suffered their own losses and are busy with other things at the moment and have left the rigs on site at E.G.O. for now.

We are consulting experts as to when it will be safe to drill, but estimates are 3-5 weeks from the last aftershock. There was a 4.1 aftershock today where the epicenter was only 30 miles from E.G.O. so it won't be for the next month at least.